2000L SUS304 3 Vessels Beer Brewing Equipment for Sale
Overview Product Description2000L SUS304 3 Vessels Beer Brewing Equipment For Sale Hot Products Company Profile Our Adva
Description
Basic Info.
Model NO. | MT-2000L |
Brewhouse Heating | Steam Jacket,Electric Tube,Direct Fire |
Fermenter | Double Wallet with Dimple Cooling Jacket |
Electric Elements | up to Ce UL Standard |
Control Unit | Temp. Controller ,HMI , PLC or Touching Screen |
Guarantee Warranty | 3 Years for Tank |
Cooling Unit | Chiller with Glycol Tank |
After Sales Service | Installation and Equipment Commission |
Material | Full Stainless Steel SUS304 |
Welding | Arc Argon Protection |
Condition | New |
Material Thickness | Inner Wallet 3mm outer Wallet 2mm |
Transport Package | Plastic Film, Plywood Case; Container; |
Specification | User Requirements |
Trademark | METO |
Origin | Jinan China |
HS Code | 84384000 |
Production Capacity | 10 Set/Sets Per Month Stainless Steel Brewhouse |
Product Description
Product Description2000L SUS304 3 Vessels Beer Brewing Equipment For Sale
UNit | Components | Capacity | Specification |
Milling | Miller | 500KG/H | Double Roller,Noise<60db |
Brewhouse | Mash/Lauter tun | 1500L | Mashing Process:Decoction.Infusion.Multi-step infusion |
Brew Kettle/Whirlpool Tank | 1500L | Heating source:Steam,Electric,direct fire SUS304/Red copper | |
Hot Water Tank | 1500L | Heating source:Steam,Electric,Gas | |
Heat exchanger | 15 SQM | Stainless steel plate | |
Fermentation tank | Fermentation Tank (The number according to customer requirements) | 1500L or 3000L | Top manway/Side manway Drying hop port to brew IPA Dimple Plate Cooling jacket Carbonation port to fill CO2 |
Yeast Adding Tank | 15- 30L | SUS304 Stainless Steel | |
Cooling System | Glycol Water tank | 3000L | Equiped with PU level indicator |
Chiller | 2*5Hp | UL/CE certified electric elements,Copeland compressor | |
Pump | 10T/H | ||
Cleaning System | Disinfection Tank | 150L | SUS304 full welded |
Alkali Tank | 150L | ||
Pump | 5T/H | ||
Control System | Control Cabinet | PID or PLC | |
Optional | Auger System Grain CaseGrist Hydrator Piping flow panel for BrewhouseBrewhouse Separate PLC ControllerSteam Boiler Customized ...... |
Packaging Details
1.LCL/FCL(20GP/40GP/40HQ).2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.3.Up to export standard, suitable for delivery.4.Customer's requirements available.
FAQOur service for you:
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings ofyour brewery;2. Professional engineers going abroad for the installation ,debugging, and training, all thetravelling cost and locate food, and hotel shall be afforded by the buyer3. The installation period is about 15 days including assembling brewing tanks and training theoperator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineerfor the extended installation.4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communicationmethod available to the customer.5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,etc. shouldbe installed separately. If needed, cost calculate additionally. 6. Brewing technology, brewing formula, can be offered available7. More spare parts are available to offered freely.
Prev: 200L
Next: 99.99% High Purity Psa Nitrogen Production Equipment, 5 ~ 8000nm3/Hr Psa Nitrogen Generator 0~8bar
Our Contact
Send now